SEA has been awarded the trenching of two pipelines (40” & 32”) for approximately 9,078m in length, and the laying and trenching on an optical cable for approximately 5,509m in length.
The 40” & 32” pipelines will be trenched at 2m TOP and the laying and trenching of an optical cable at 3m TOC.