We are pleased to confirm that SEA has successfully trenched Chevron’s Import Line for the EGP3A Phase 2 Trenching Work Project (Nigeria).
The 24” pipeline had momentarily been shut down for the operations whilst SEA attempted to trench it as quickly as possible with two trenching spreads working contemporarily on either end of the pipeline.
Attached is a letter from our relieved Client!