SEA has successfully completed the burial of 450m of a 4,5” pipeline: even if the pipeline did not have any concrete coating protection, it was trenched to a depth of 2m TOP, by carrying out further passes, using SEA’s standard post-trenching machine JOLLY PTM, which runs along the pipeline.