The LEO 2 PTM has been specially built for SEA’s latest project. It is the latest generation of post-trenching machines designed and built to be particularly adapt for loose to medium/hard seabeds.
It can be deprived of its ballast tank in order to operate in much shallower waters.
![](http://www.seatrenching.it/wp-content/uploads/2015/12/Attachment-24.jpg)