SEA S.r.l. has been contracted by ILK CONSTRUCTION for the execution of the post-trenching activities of a 14” pipeline in the Deniz West Oil Development Project.

The operations shall be performed from the shoreline (SHORE APPROACH AREA) to approx. 12 m water depth.

The main challenge of this project is to perform post-trenching operations in a ROCKY seabed.